Crews to begin pond retrofit in Lake Whatcom watershed

HB Hansen is under a $110,000 contract for the work, which includes filling the pond and installing a stormwater vault, swale and rock gallery to catch and treat stormwater. The treatment method is based on a model being tested by Western Washington University.